Below are Letters of Agreements (LOA’s), Memorandums of Understanding (MOU’s – which are essentially the same as LOA’s), and Review Committee decisions (RC’s) from the current and previous contract cycles.  For other documents and historical research, consult the ESC PG&E steward database or contact your Union Rep.

Use the search box to the right to filter for relevant documents.

Found 63 Results

RC 924 Upgrade Clarification

When upgraded to a higher classification, employees cannot be paid above the maximum pay for that classification.


RC 937 (Superseded): POT Cancellation 2-hr Minimum

2 hour minimum pay on Sunday when POT was cancelled on Sunday. Note: this decision was without precedent, but this issue was corrected in the 2016-19 contract.


RC 938 (Superseded): PMP Ratings Are Not Grievable

This said that PMP ratings themselves cannot be grieved; however this was changed in the 2016-19 contract and PMP ratings are now grievable.